Site Preparation

Professional UXO Services. We hold ourselves to a higher standard!

Design, Build, Test, and Field technologies for the UXO industry.

Site Preparation:

The first step in all Range Remediation efforts is site preparation. Vegetation removal and visual identification of MPPEH (Material Potentially Presenting Explosive Hazard) must take place prior to removal activities in order to determine the extent of contamination.

In order for removal personnel to carry out their duties, they must be able to move freely and have unrestricted view of the ground. If shrub cover is removed down to 6" - 12' above ground surface (AGS), OE detection work can be accomplished. A vegetation removal method that causes a minimum of environmental impact should be chosen. Site specific and safety considerations govern the choice of equipment and approach to each task.

The use of armored equipment allows TES to utilize the most appropriate methods while ensuring protection of operating personnel should an unintentional detonation occur.

hub zone certified

 

California HUBZone
Certified #47824

Recent Projects

USACE Huntsville Ft. Benning, AL

URS Group Inc./Air Force Frmr Ft. Glen, Alaska

Zapata Inc. Air Force Cuddeback, CA

URS Group Inc. Air Force Beale AFB

California & Houston
Headquarters

Office:(209) 586-1541
Fax:(209) 586-2707
[email protected]

California Headquarters
22709 Twain Harte Drive
Twain Harte, CA 95383

Texas
3225 Honea Egypt Road
Montgomery, Texas 77316